Timing is everything on a site where a row of units goes up together. Each roof needs spraying after the cables are run and before the ceilings are boarded, so the work has to fit in around the other trades. For a developer, that means a sprayer who turns up when the programme says and leaves the roof ready for whoever comes next.
These modular units in Co Offaly have a boarded loft under a pitched roof, with roof windows in the slope. That puts the underside of the roof over usable space, so that’s where the airtightness and insulation had to be. We sprayed OC500 open-cell foam between the rafters and into the low side walls, and brought it tight around the roof window frames, where draughts often get in. Open-cell foam is soft and light, and it expands into the gaps around timbers and cables. It stays vapour-open, which suits a timber frame, and vent cards keep a ventilation path open at the eaves.